Project Details Client Location Services SMART Oakland Terminal EV Infrastructure Projects HRC recently designed SMART’s Oakland Terminal electric bus charging station. HRC worked with the bus manufacturer to determine equipment sizes and create plans and specifications for the charging station, then Bid documents were prepared in cooperation with SMART’s procurement team. Our professional team of […]
River Walk Improvements
HRC was retained by the City of Utica to provide design engineering for streambank and recreation enhancements at Memorial and Heritage Parks, which are owned by the City. The location, exposure, access, and natural resources made these parks prime for improvement.
The HRC Team provided design, site plan development, permit administration, and reporting for the projects. Design included substantial toe protection to mid-bank and upland areas adjacent to the river using a combination of deep rooted vegetation, hard armoring, and bioengineering techniques.
City of Howell WWTP Generator and Switchgear Replacement
HRC was retained by the City of Howell to provide the Master Plan and SRF Project Plan development for replacement and upgrades of existing processes at the City’s Wastewater Treatment Plant (WWTP) to newer and more energy efficient technologies.
Partridge Creek Habitat Restoration
Over one mile of the Partridge Creek (Gloede Drain) flows through an area of 50 acres which was previously a golf course. The area included several adjacent pocket wetlands. The existing site consisted of aquatic and terrestrial invasive species, eroded bank regions along the drain corridor, fragmented wetland areas, and degraded golf cart paths that narrow the channel width and obstruct flows. The project was separated into four phases that included: Invasive Plant Species Removal, Gloede Drain Natural Channel Design Restoration, Wetland Restoration, and Oak Openings Restoration.