Project Details

Client
Location
Services
Road Commission for Oakland County Beverly Hills, MI Transportation, Survey

HRC performed a 1.6 mile long topographic design survey for the removal of the existing roadway and replacement with a wider pavement. In addition to the surface features, all underground utilities were located, including public sanitary sewers, storm sewers, water mains and also numerous private utilities located within the existing right-of-way. The survey extended into the adjacent properties to allow the determination of required grading, construction, and permanent utility easements.

tienken road street view

HRC responsibilities include:

  • Topographic Design Survey
  • Traffic Study and Analysis
  • ROW/Easements Descriptions
  • Preliminary Cost Estimate
  • Drainage Plans
  • Stormwater Management Plans
  • Traffic Signals
  • Pavement Markings
  • Utility Coordination
  • Maintaining Traffic Plans
  • Permitting